FireDOC Search

displaying 1 - 10 results in total 14

  • Building Research Establishment
    view article (1.0)

    Accuracy in Setting-Out.
    Building Research Establishment, Watford, England
    BRE Digest 234, February 1980, 8 p.

  • Giles, S.; Zablodil, R. J.
    view article (1.0)

    Development of Fire Protection for Arctic Prefabricated Buildings.
    U.S. Naval Civil Engineering Research and Evaluation Lab. Fire Extinguishment Research and Engineering Proceedings of the Symposium. November 16-18, 1954, Port Hueneme, CA, 328-341 p., 1954

  • Danner, W. F.; Leppanen, P.
    view article (1.0)

    Case Study of the Conceptual Product Modelling of Buildings: Prefabricated Reinforced Concrete Structure.
    National Institute of Standards and Technology, Gaithersburg, MD; Technical Research Center of Finland, Espoo
    CIB Conference. October 1990, 1-6 p., 1990

  • Cooke, P. W.; Eisenhard, R. M.
    view article (1.0)

    State Adopted Building Regulations for the Construction of Manufactured Buildings: An Analysis.
    National Bureau of Standards, Washington, DC
    NBSIR 78-1503, July 1978,

  • Protexol Corporation
    view article (1.0)

    Report of a One-Hour Fire Test of a Prefabricated Wall Panel for the United States Plywood Corporation of New York City, New York.
    Protexol Corp., Kenilworth, NJ
    Test No. 8-58, November 12, 1958, 20 p.

  • Hall, J. R., Jr.
    view article (1.0)

    Manufactured Home Fires Experience Through 1989 Fires. Final Report.
    National Fire Protection Association, Quincy, MA
    Department of Housing and Urban Development, Washington, DC; NAHB National Research Center, Upper Marlboro, MD, HUD-0005998, April 1992, 181 p.

  • Ryan, J. V.
    view article (1.0)

    Fire Endurance and Heat Transfer Tests of Prefabricated Panels.
    National Bureau of Standards, Gaithersburg, MD
    NBS 6837, May 4, 1960, 26 p.

  • Roche, L.; Graves, H.; Bromley, K.
    view article (1.0)

    Standardised and Prefabricted Wiring for Buildings. Use in Building Services.
    Building Research Establishment, Garston, England
    BRE IP 15/01; IP 15/01; Information Paper 15/01; Part 1, September 2001, 8 p.

  • Roche, L.; Graves, H.; Bromley, K.
    view article (1.0)

    Standardised and Prefabricted Wiring for Buildings. Case Studies.
    Building Research Establishment, Garston, England
    BRE IP 15/01; IP 15/01; Information Paper 15/01; Part 2, September 2001, 8 p.

  • Bagenholm, C.; Yates, A.; McAllister, I.
    view article (1.0)

    Prefabricted Housing in the UK. A Case Study: Murray Grove, Hackney.
    Building Research Establishment, Garston, England
    BRE IP 16/01; IP 16/01; Information Paper 16/01; Part 1, September 2001, 6 p.