FireDOC Search

displaying 1 - 7 results in total 7

  • Campbell, C. A.
    view article (1.0)

    Ignite the Issue: Preserve the Federal Fire Programs. Phase 2. Focusing on the Appropriations Committees.
    International Association of Fire Chiefs, Washington, DC
    Phase 2
    Phase 2
    April 7, 1986
    19 p.

  • Hansen, A. T.; Platts, R. E.
    view article (1.0)

    Cost of Saving Property and Lives by Fire Sprinklering New Homes. Phase 2. CMHC Study: Analysis of the Costs and Benefits of Installing Fire Sprinklers in Houses.
    Scanada Consultants, Ltd., Ontario, Canada
    Phase 2
    Canada Mortgage and Housing Corp., Ontario, Canada, Phase 2
    June 1988
    102 p.

  • Hansen, A. T.; Platts, R. E.
    view article (1.0)

    Costs and Benefits of Smoke Alarms in Canadian Houses.
    Scanada Consultants, Ltd., Ontario, Canada
    Phase 2
    Canada Mortgage and Housing Corp., Ontario, Canada, Phase 2
    March 1, 1990
    54 p.

  • National Fire Protection Association
    view article (1.0)

    FIFI: Fire Information Field Investigation. Phase 2. Final Report.
    National Fire Protection Association, Boston, MA
    ['Phase 2', 'Final Report']
    National Bureau of Standards, Washington, DC, Phase 2; Final Report
    January 22, 1973
    11 p.

  • Kerlin, D. J.; McDaniel, D. E.
    view article (1.0)

    Machinery Space Fire Detecting Tests. Phase 2.
    Coast Guard Headquarters, Washington, DC
    Phase 2
    Phase 2
    July 1971
    30 p.

  • Black, B. H.; Maranghides, A.; Sheinson, R. S.; Peatross, M. J.; Smith, W. D.
    view article (1.0)

    Real Scale Halon Replacement Testing Aboard the ex-USS SHADWELL: Phase 2. Post Fire Suppression Compartment Characterization.
    Naval Research Laboratory, Washington, DC; GEO-Centers, Inc., Ft. Washington,MD; Hughes Associates, Inc., Baltimore, MD
    ['NRL/MR/6180-97-7939', 'Phase 2']
    NRL/MR/6180-97-7939; Phase 2
    April 14, 1997
    20 p.
    Halon Options Technical Working Conference. Proceedings. HOTWC 1996. Sponsored by: University of New Mexico, Halon Alternative Research Corp., National Association of Fire Equipment Distributors, Inc., Hughes Associates, Inc., and Kidde International. May 7-9, 1996, Albuquerque, NM, 423-434 p., ['1997', '1996']

  • Beitel, J. J.; Griffith, J. R., Jr.
    view article (1.0)

    Development of an Intermediate-Scale Fire Test for the Evaluation of Flammability Characteristics of Exterior, Non-Loadbearing Wall Panel Assemblies Using foam Plastic Insulation. Phase 2. Revised Final Report. Volume 1.
    Southwest Research Institute, San Antonio, TX
    Phase 2
    Society of the Plastics Industry, Inc., New York, NY, Phase 2
    May 1994
    136 p.