FireDOC Search

displaying 91 - 100 results in total 453

  • Construction Industry Institute
    view article (1.0)

    Contract Risk Allocation and Cost Effectiveness.
    Construction Industry Institute, Austin, TX
    Publication 5-3
    Publication 5-3
    November 1988
    21 p.

  • Construction Industry Institute
    view article (1.0)

    Allocation of Insurance-Related Risks and Costs on Construction Projects.
    Construction Industry Institute, Austin, TX
    Publication 19-1
    Publication 19-1
    November 1993
    44 p.

  • Witt, R. C.; Aird, P. R.; Brook, Y.
    view article (1.0)

    Optimal Allocation of Insurance Related Risks and Costs in Construction Projects.
    University of Texas, Austin
    Source Document 96
    Source Document 96
    October 1993
    330 p.

  • Revue de l'OIPC/ICDO Journal
    view article (1.0)

    Geographical Information at the Service of Civil Protection.
    Revue de l'OPIC/ICDO Journal, Vol. 8, 20-24, March 1995

  • Bjorkman, J.; Keski-Rahkonen, O.
    view article (1.0)

    Fire Safety Risk Analysis.
    VTT-Technical Research Center of Finland, Espoo
    Institution of Fire Engineers; University of Sunderland; Fire Research Station; CIB W14; Tyne and Wear Metropolitan Fire Brigade. Fire Safety by Design. Conference Proceedings. Volume 3. Research Papers. July 10-12, 1995, UK, 3-8 p., 1995

  • Dodman, N.; Ransley, P.
    view article (1.0)

    Safety Case Development for a New Underground Mass Transit Railway.
    London Underground Limited, UK
    University of Dundee and Independent Technical Conferences Ltd. Safety in Road and Rail Tunnels. International Conference, 2nd (Second). Proceedings. April 3-6, 1995, Granada, Spain, Vardy, A. E., Editors, 585-592 p., 1995

  • Haile, J.; Boyer, H.
    view article (1.0)

    Loss Prevention System for Crossrail: Risk Avoidance and Risk Management in Engineering Design.
    CrossRail
    University of Dundee and Independent Technical Conferences Ltd. Safety in Road and Rail Tunnels. International Conference, 2nd (Second). Proceedings. April 3-6, 1995, Granada, Spain, Vardy, A. E., Editors, 601-608 p., 1995

  • Metz, R.
    view article (1.0)

    Safety Procedures for Fires Occuring in Tunnels Along the High-Speed Tracks of Deutsche Bahn AG.
    Deutsche Bahn AG, Germany
    Bundesministerium fur Bildung and Studiengesellschaft Stahlanwendung e.V. and Technische Universitat Braunscheweig and Studiengesellschaft fur unterirdische Verkehrsanlagen e.V. Fire Protection in Traffic Tunnels. International Conference With Exhibition. Proceedings. September 12-13, 1995, Dresden, Germany, 186-193 p., 1995

  • Advisory Group for Aerospace Research and Development
    view article (1.0)

    Anthropomorphic Dummies for Crash and Escape System Testing.
    Advisory Group for Aerospace Research and Development, France
    AGARD-AR-330
    AGARD-AR-330
    July 1996
    116 p.

  • Fischer, W.; Jaecklin, A.; Hildbrand, K. E.
    view article (1.0)

    Integriertes Risk Management und Risk Controlling. [Integrated Risk Management and Risk Controlling.]
    Gerling Consulting Gruppe AG, Zurich
    Paper 17
    Paper 17
    Institut de Securite. Fire Safety Conference on Performance Based Concepts. Proceedings. October 15-17, 1996, Zurich, Switzerland, 17/1-19 p., 1996