Crain, J. L.; Thomas, L. G.
view article (4.7078753)
Conceptual Design of a Civil Defense Rescue System With a Supplement on Community Manpower Resources. Phase 2. Final Report.
Stanford Research Inst., Menlo Park, CA
Office of Civil Defense, San Francisco, CA,
NRDL-TRC-67-01,
August 1967,
116 p.
Francis, R. L.; Saunders, P. B.
view article (4.7078753)
Network Models of Building Evacuation.
Gainesville Univ., FL; National Bureau of Standards, Gaithersburg, MD
NBSIR 80-2070,
June 1980,
Second International Seminar on Human Behavior in Fire Emergencies. October 29, 1978-November 1, 1978, Gaithersburg, MD, Levin, B. M. and Paulsen, R. L. Editor(s), 145-146 pp, 1978 AND National Fire Protection Association. Analytical Problems in Firesafety: Rational Firesafety Design. Joint ORSA/TIMS Meeting. May 1980, Washington, DC, 1980.,
1980
Building Official and Code Administrator
view article (4.7078753)
Tale of Two Hospital Fires.
Building Official and Code Administrator,
Vol. 22,
No. 3,
14,
May/June 1988
National Transportation Safety Board
view article (4.7078753)
Safety Effectiveness Evaluation of Rail Rapid Transit Safety.
National Transportation Safety Board, Washington, DC
NTSB-SEE-81-1,
January 22, 1981,
111 p.
Wood, P. G.
view article (4.7078753)
Survey of Behavior in Fires.
Surrey Univ., Guildford, England
Fires and Human Behavior,
John Wiley and Sons, New York,
Canter, D., Editors,
83-95 p.,
1980
Best, R.
view article (4.7078753)
Evacuation of Mississauga. Part 1.
National Fire Protection Assoc., Quincy, MA
Fire Command,
Vol. 47,
No. 7,
14-16,
July 1980
Stevens, J. B.
view article (4.7078753)
Hazardous Materials: Calculating Containment Corridors.
Firehouse,
Vol. 5,
No. 4,
12,16,
April 1980
Muta, K.; Sato, H.; Ouchi, T.; Hara, Y.
view article (4.7078753)
Study on a Total Fire Safety System.
Kajima Institute of Construction Technology, Tokyo, Japan; Kajima Corporation Information Processing Center, Tokyo, Japan
Conseil International du Batiment (CIB). Systems Approach to Fire Safety in Buildings. Volume 1. Session 1. Conception and Objectives of Fire Safety; Fail-Safe Conception, Public Cost and Investment Objective. Session 2. Evaluation and Planning Method (Overall Systems). August 29-30, 1979,
Tsukuba, Japan,
II/79-92 p.,
1979
Jin, T.
view article (4.7078753)
Evaluation of Fire Exit Signs in Smoke.
Fire Research Inst., Mitaka-City, Japan
Conseil International du Batiment (CIB). Systems Approach to Fire Safety in Buildings. Volume 2. Session 3. Active Systems Performance and Criteria: Smoke Control, Detection, Sprinklers. Session 4. Passive Systems Performance and Criteria: Combustibles, Fire Resistance. August 29-30, 1979,
Tsukuba, Japan,
III/73-78 p.,
1979
Cheney, R. S.
view article (4.7078753)
Follow-On Operational Test and Evaluation (II) of Smoke and Fumes Elimination Procedures on the C-22 Aircraft. Final Report.
Air Force Airlift Center, Pope AFB, NC
MAC Project 15-102-85F,
April 1988,
79 p.