FireDOC Search

displaying 1371 - 1380 results in total 1947

  • Popoff, A., Jr.
    view article (1.0)

    Stability of Precast Concrete Systems Buildings.
    ABAM Engineers, Inc., Tacoma, WA
    Planning and Design of Tall Buildings International Conference. Proceedings. Volume 3. Structural Design of Tall Concrete and Masonry Buildings. Technical Committee No. 23. State of Art Report No. 5. American Society of Civil Engineers-International Association for Bridge and Structural Engineering (ASCE-IABSE). Sponsored by U.S. National Science Foundation. August 21-26, 1972, Bethlehem, PA, Reese, R. C.; Wastlund, G.; Lyse, I. M., Editors, 571-583 p., 1972

  • Schulte, R. C.
    view article (1.0)

    Reasonable High Rise Fire Safety.
    Schulte and Associates, Evanston, IL
    Plumbing Engineer, Vol. 31, No. 4, 8,10,14, April 2003

  • Moncada, J. A.
    view article (1.0)

    New Solutions in Fire Safety for Old Problems. A Latin American Perspective.
    Fire Suppression and Detection Research Application Symposium. Research and Practice: Bridging the Gap. Proceedings. Fire Protection Research Foundation. January 22-24, 2003, Orlando, FL, 62-66 p., 2003

  • International Council for Research and Innovation in Building and Construction (CIB)
    view article (1.0)

    Measurement and Management of Architectural Value in Performance-Based Building.
    International Council for Research and Innovation in Building and Construction, Sweden
    ['CIB Report 283', 'CIB Publication 283']
    CIB Report 283; CIB Publication 283
    Measurement and Management of Architectural Value in Performance-Based Building. Theoretical Approaches, Research Projects, Best Practice Examples. Joint Conference. CIB W60 Performance Concept in Building. CIB W96 Architectural Management. May 2002., Hong Kong, Ang, G.; Prins, M.; Tol, S., Editors, 460 p., 2002

  • Singer, E. N.
    view article (1.0)

    Radio Communications in High Rise Buildings...The Cross-Band Repeater: An Improvement in High-Rise Communications.
    W.N.Y.F., Vol. 42, No. 1, 10-12, 1981

  • Ross, J. M.
    view article (1.0)

    Interior Radio Repeater: Can It Be An Improvement in High Rise Communications? Strategic Analysis of Fire Deparment Operations.
    Cincinnati Fire Dept., OH

    December 1989
    25 p.

  • Ross, J. M.
    view article (1.0)

    Leadership Roles and Developing the Interior Radio Repeater as a High Rise Communication System.
    Cincinnati Fire Dept., OH

    November 1991
    28 p.

  • Collins, L.
    view article (1.0)

    Heliocpter Operations for High-Rise Emergencies.
    Fire Engineering, Vol. 156, No. 3, 105-106,108,110,112,114, March 2003

  • Shouldis, W.
    view article (1.0)

    Hathaway House High-Rise Fire: Lesson in Logistics.
    Fire Engineering, Vol. 156, No. 5, 75-76,78-80, May 2003

  • Terpak, M. A.
    view article (1.0)

    Fireground Size-Up: Row Frames.
    Fire Engineering, Vol. 156, No. 5, 81-82,84,86,88, May 2003