FireDOC Search

displaying 191 - 200 results in total 453

  • Quah, L. K.
    view article (6.168359)

    Evaluation of the Risks in Tendering for Refurbishment Work.
    National University of Singapore
    CIB 92,
    Conseil International du Batiment. Congres Mondial du Batiment. World Building Congress CIB 92. Proceedings [Compte-rendu]. Tome 1. Session 2D. Operation and Maintenance of Buildings. May 18-22, 1992, Montreal, Canada, 295-298 p., 1992

  • Westphal, P.; Taylor, E.; Aurand, D.
    view article (6.168359)

    Human Health Risk Associated With Burning as a Spill Countermeasure.
    Woodward-Clyde, Denver, CO; Taylor Environmental and Marine Services, Bainbridge Island, WA; Marine Spill Response Corp., Washington, DC
    NIST SP 995; Volume 2, March 2003,
    Environment Canada. Arctic and Marine Oil Spill Program (AMOP) Technical Seminar, 17th Proceedings. Volume 1. June 8-10, 1994, Environment Canada, Ottawa, Ontario, Vancouver, British Columbia, 685-705 p., ['1994', '2003']

  • Witt, R. C.; Aird, P. R.; Brook, Y.
    view article (6.168359)

    Optimal Allocation of Insurance Related Risks and Costs in Construction Projects.
    University of Texas, Austin
    Source Document 96, October 1993, 330 p.

  • Haile, J.; Boyer, H.
    view article (6.168359)

    Loss Prevention System for Crossrail: Risk Avoidance and Risk Management in Engineering Design.
    CrossRail
    University of Dundee and Independent Technical Conferences Ltd. Safety in Road and Rail Tunnels. International Conference, 2nd (Second). Proceedings. April 3-6, 1995, Granada, Spain, Vardy, A. E., Editors, 601-608 p., 1995

  • Fischer, W.; Jaecklin, A.; Hildbrand, K. E.
    view article (6.168359)

    Integriertes Risk Management und Risk Controlling. [Integrated Risk Management and Risk Controlling.]
    Gerling Consulting Gruppe AG, Zurich
    Paper 17,
    Institut de Securite. Fire Safety Conference on Performance Based Concepts. Proceedings. October 15-17, 1996, Zurich, Switzerland, 17/1-19 p., 1996

  • Hammerschmidt, L.
    view article (6.168359)

    Verminderung des Einsatzrisikos durch ein personliches Signalgerat fur Feuerwehrmanner. [Reduction of Operation Risks by Personal Signal Transmitter for Firemen.]
    VFDB, Vol. 45, No. 4, 180-182, November 1996

  • Hadjisophocleous, G. V.; Benichou, N.; Tamim, A. S.
    view article (6.168359)

    Literature Review of Performance-Based Fire Codes and Design Environment.
    National Research Council of Canada, Ottawa, Ontario
    Journal of Fire Protection Engineering, Vol. 9, No. 1, 12-40, 1998
    NRCC 39302,

  • Vigiano, J. T.
    view article (6.168359)

    Meritorious Act: Hot to Prepare a Proper Commendation Report.
    New York City Fire Dept., NY
    Firehouse, Vol. 24, No. 2, 64,66, February 1999

  • Fire Research News
    view article (6.168359)

    Establishing Appropriate Risk Criteria.
    Fire Research News, No. 24, 1-2, Autumn 2001

  • Wang, W. C.
    view article (6.168359)

    Simulation-Facilitated Factor-Based Approach for Cost Correlation Evaluation.
    National Chiao Tung Univ., Hsin-Chu, Taiwan
    NIST SP 989, September 2002,
    International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 97-102 p., 2002