Simenko, P.
view article (5.735457)
Reliability Assessment of Vertical Egress Provisions in High Rise Residential Buildings.
Simenko Consulting, Victoria, Australia
Performance-Based Codes and Fire Safety Design Methods, 4th International Conference. Proceedings. March 20-22, 2002,
Melbourne, Australia,
Almand, K.; Coate, C.; England, P.; Gordon, J., Editors,
347-357 p.,
2002
Horasan, M. B. N.; Ramsay, G. C.; Taylor, P. T.
view article (5.735457)
Reverse Engineering as a Tool in Fire Safety Engineering Assessments.
AGAL, Victoria, Australia
Performance-Based Codes and Fire Safety Design Methods, 4th International Conference. Proceedings. March 20-22, 2002,
Melbourne, Australia,
Almand, K.; Coate, C.; England, P.; Gordon, J., Editors,
358-369 p.,
2002
Lundin, J.; Frantzich, H.
view article (5.735457)
Cost-Benefit and Risk Analysis: Basis for Decisions in the Fire Safety Design Process.
Lund Univ., Sweden
Performance-Based Codes and Fire Safety Design Methods, 4th International Conference. Proceedings. March 20-22, 2002,
Melbourne, Australia,
Almand, K.; Coate, C.; England, P.; Gordon, J., Editors,
370-381 p.,
2002
Johnson, P.; Hewitt, J.; Callander, M.; Paverley, J.; Loveridge, R.; Lundqvist, M.; Grace, T.; Daimatsu, S.; Hokugo, A.; Nanbu, A.; Nakamichi, A.; Notake, H.; Matsuyama, K.; Yamaguchi, J.; Ohmiya, Y.; Hagiwara, I.; Harada, K.; Tomatsu, t.; Tanka, T.
view article (5.735457)
Arup Fire, Sydney, Australia
Koyto Univ., Japan; Society of Fire Safety, Melbourne, Australia; International Council for Research and Innovation in Building Construction, Sweden,
Fire Safety Design of a High Rise Hotel. Australian Case Study. Japanese Case Study. Volume 1. Case Studies. Performance-Based Codes and Fire Safety Design Methods, 4th International Conference. Proceedings. March 20-22, 2002,
Melbourne, Australia,
Almand, K.; Coate, C.; England, P.; Gordon, J., Editors,
130 p.,
2002
McElvaney, J.
view article (5.735457)
Performance-Based Design Review Process Used in the City of Phoenix.
Fire Protection Engineering,
No. 14,
8-11,
Spring 2002
Foo, S.; A'Doust, G.; Richardson, K.
view article (5.735457)
Computerized Design Challenges.
Ken Richardson Fire Technologies, Inc.; Public Works and Government Services, Canada
NFPA Journal,
Vol. 96,
No. 3,
86-90,
May/June 2002
Tubbs, B.
view article (5.735457)
ICC Performance Initiatives and Fire Protection Design.
International Code Consultants, Austin, TX
Fire Protection Strategies for 21st Century Building and Fire Codes Symposium. EXTENDED ABSTRACTS. Proceedings. Society of Fire Protection Engineers and American Institute of Architects. September 17-18, 2002,
Baltimore, MD,
25-29 p.,
2002
Weber, R. D.
view article (5.735457)
Alternative Methods of Prescriptive Code Provisions.
R.D. Weber and Associates, Inc., Las Vegas, NV
Fire Protection Strategies for 21st Century Building and Fire Codes Symposium. EXTENDED ABSTRACTS. Proceedings. Society of Fire Protection Engineers and American Institute of Architects. September 17-18, 2002,
Baltimore, MD,
35-44 p.,
2002
Society of Fire Protection Engineers; Lund University
view article (5.735457)
Performance-Based Codes and Fire Safety Design Methods, 3rd International Conference. Proceedings. June 15-17, 2000.
Society of Fire Protection Engineers, Bethesda, MD; Lund Univ., Sweden
Society of Fire Protection Engineers, Bethesda, MD; International Council for Research and Innovation in Building and Construction, Sweden; International Fire Safety Engineering Institute,
Performance-Based Codes and Fire Safety Design Methods, 3rd International Conference. Proceedings. June 15-17, 2000,
Lund, Sweden,
Jonsson, R.; Almand, K.; Maskas, J., Editors,
440 p.,
2000
Marchant, R.
view article (5.735457)
Australia's Performance-Based Design Option: Four Years On. A Code Official's Perspective.
South Australian Metropolitan Fire Service, Adelaide, Australia
Performance-Based Codes and Fire Safety Design Methods, 3rd International Conference. Proceedings. June 15-17, 2000,
Lund, Sweden,
Jonsson, R.; Almand, K.; Maskas, J., Editors,
9-22 p.,
2000