FireDOC Search

displaying 11 - 20 results in total 22

  • Dikkers, R. D.
    view article (1.0)

    Coordinated Evaluation System (CES) Project. Model Documentation for Buidling Regulation. Final Technical Note.
    National Bureau of Standards, Washington, DC
    NBS TN 775
    NBS TN 775
    May 1973

  • Dikkers, R. D.; Marshall, R. D.; Thom, H. C. S.
    view article (1.0)

    Hurricane Camille: August 1969. Final Report.
    National Bureau of Standards, Washington, DC
    NBS TN 569
    NBS TN 569
    March 1971
    73 p.

  • Waksman, D.; Pielert, J. H.; Dikkers, R. D.; Streed, E. R.
    view article (1.0)

    Plan for the Development and Implementation of Standards for Solar Heating and Cooling Applications. Interim Report.
    National Bureau of Standards, Washington, DC
    NBSIR 76-1143
    Energy Research and Development Administration, Washington,DC, NBSIR 76-1143
    August 1976

  • Waksman, D.; Pielert, J. H.; Dikkers, R. D.; Streed, E. R.; Niessing, W. J.
    view article (1.0)

    Plan for the Development and Implementation of Standards for Solar Heating and Cooling Applications. Interim Report.
    National Bureau of Standards, Washington, DC
    NBSIR 78-1143A
    Department of Energy, Washington, DC, NBSIR 78-1143A
    June 1978

  • Dikkers, R. D.; Kennish, W. J.; Winn, C. B.; Huston, W.
    view article (1.0)

    Research Priorities for Improving the Effectiveness of Active Solar Hot Water and Space Conditioning Systems. Final report.
    National Bureau of Standards, Gaithersburg, MD; TPI, Inc., Beltsville, MD; Solar Environmental Engineering Co., Inc., Fort Collins, CO
    NBSIR 84-2980
    Department of Energy, Washington, DC, NBSIR 84-2980
    December 1984

  • Dikkers, R. D.; Reeder, B. C.
    view article (1.0)

    Standards for Building Materials, Equipment and Systems Used in Detention and Correctional Facilities. Final Report.
    National Bureau of Standards, Gaithersburg, MD
    NBSIR 87-3687
    Department of Justice, Washington, DC, NBSIR 87-3687
    November 1987

  • Dikkers, R. D.; Husmann, R. J.; Webster, J. H.; Sorg, J. P.; Holmes, R. A.
    view article (1.0)

    Preliminary Performance Criteria for Building Materials, Equipment and Systems Used in Detention and Correctional Facilities.
    National Institute of Standards and Technology, Gaithersburg, MD; Omni Signal, Inc., Capitola, CA; Webster (James H.), Arlington, VA; Sorg (John P.), Annandale, VA; Sure-Lock Holmes, Inc., Albany, NY
    ['NISTIR 89-4027', 'NUREG/CP-0103']
    Department of Justice, Washington, DC, NISTIR 89-4027; NUREG/CP-0103
    January 1989
    157 p.

  • Dikkers, R. D.; Trechsel, H. R.; Cooke, P. W.; Tejuja, H. K.; Zelenka, L. P.
    view article (1.0)

    Model Documents for the Evaluation, Approval, and Inspection of Manufactured Buildings. Volume 1. Text and Appendixes. Preliminary Report.
    National Bureau of Standards, Washington, DC
    ['NBSIR 73-278', 'Volume 1']
    NBSIR 73-278; Volume 1
    September 1973
    98 p.

  • Dikkers, R. D.; Trechsel, H. R.; Cooke, P. W.; Tejuja, H. K.; Zelenka, L. P.
    view article (1.0)

    Model Documents for the Evaluation, Approval, and Inspection of Manufactured Buildings. Volume 2. Submission Documents. Preliminary Report.
    National Bureau of Standards, Washington, DC
    ['NBSIR 73-278', 'Volume 2']
    NBSIR 73-278; Volume 2
    September 1973
    72 p.

  • Dikkers, R. D.; Trechsel, H. R.; Cooke, P. W.; Tejuja, H. K.; Zelenka, L. P.
    view article (1.0)

    Model Documents for the Evaluation, Approval, and Inspection of Manufactured Buildings. Volume 3. Evaluation and Approval Documents. Preliminary Report.
    National Bureau of Standards, Washington, DC
    ['NBSIR 73-278', 'Volume 3']
    NBSIR 73-278; Volume 3
    September 1973
    64 p.