displaying 11 - 20 results in total 22
Dikkers, R. D.
view article (1.0)Coordinated Evaluation System (CES) Project. Model Documentation for Buidling Regulation. Final Technical Note.National Bureau of Standards, Washington, DCNBS TN 775NBS TN 775
May 1973Dikkers, R. D.; Marshall, R. D.; Thom, H. C. S.
view article (1.0)Hurricane Camille: August 1969. Final Report.National Bureau of Standards, Washington, DCNBS TN 569NBS TN 569
March 1971
73 p.Waksman, D.; Pielert, J. H.; Dikkers, R. D.; Streed, E. R.
view article (1.0)Plan for the Development and Implementation of Standards for Solar Heating and Cooling Applications. Interim Report.National Bureau of Standards, Washington, DCNBSIR 76-1143Energy Research and Development Administration, Washington,DC, NBSIR 76-1143
August 1976Waksman, D.; Pielert, J. H.; Dikkers, R. D.; Streed, E. R.; Niessing, W. J.
view article (1.0)Plan for the Development and Implementation of Standards for Solar Heating and Cooling Applications. Interim Report.National Bureau of Standards, Washington, DCNBSIR 78-1143ADepartment of Energy, Washington, DC, NBSIR 78-1143A
June 1978Dikkers, R. D.; Kennish, W. J.; Winn, C. B.; Huston, W.
view article (1.0)Research Priorities for Improving the Effectiveness of Active Solar Hot Water and Space Conditioning Systems. Final report.National Bureau of Standards, Gaithersburg, MD; TPI, Inc., Beltsville, MD; Solar Environmental Engineering Co., Inc., Fort Collins, CONBSIR 84-2980Department of Energy, Washington, DC, NBSIR 84-2980
December 1984Dikkers, R. D.; Reeder, B. C.
view article (1.0)Standards for Building Materials, Equipment and Systems Used in Detention and Correctional Facilities. Final Report.National Bureau of Standards, Gaithersburg, MDNBSIR 87-3687Department of Justice, Washington, DC, NBSIR 87-3687
November 1987Dikkers, R. D.; Husmann, R. J.; Webster, J. H.; Sorg, J. P.; Holmes, R. A.
view article (1.0)Preliminary Performance Criteria for Building Materials, Equipment and Systems Used in Detention and Correctional Facilities.National Institute of Standards and Technology, Gaithersburg, MD; Omni Signal, Inc., Capitola, CA; Webster (James H.), Arlington, VA; Sorg (John P.), Annandale, VA; Sure-Lock Holmes, Inc., Albany, NY['NISTIR 89-4027', 'NUREG/CP-0103']Department of Justice, Washington, DC, NISTIR 89-4027; NUREG/CP-0103
January 1989
157 p.Dikkers, R. D.; Trechsel, H. R.; Cooke, P. W.; Tejuja, H. K.; Zelenka, L. P.
view article (1.0)Model Documents for the Evaluation, Approval, and Inspection of Manufactured Buildings. Volume 1. Text and Appendixes. Preliminary Report.National Bureau of Standards, Washington, DC['NBSIR 73-278', 'Volume 1']NBSIR 73-278; Volume 1
September 1973
98 p.Dikkers, R. D.; Trechsel, H. R.; Cooke, P. W.; Tejuja, H. K.; Zelenka, L. P.
view article (1.0)Model Documents for the Evaluation, Approval, and Inspection of Manufactured Buildings. Volume 2. Submission Documents. Preliminary Report.National Bureau of Standards, Washington, DC['NBSIR 73-278', 'Volume 2']NBSIR 73-278; Volume 2
September 1973
72 p.Dikkers, R. D.; Trechsel, H. R.; Cooke, P. W.; Tejuja, H. K.; Zelenka, L. P.
view article (1.0)Model Documents for the Evaluation, Approval, and Inspection of Manufactured Buildings. Volume 3. Evaluation and Approval Documents. Preliminary Report.National Bureau of Standards, Washington, DC['NBSIR 73-278', 'Volume 3']NBSIR 73-278; Volume 3
September 1973
64 p.