displaying 11 - 20 results in total 182
Heskestad, G.; Delichatsios, M. A.
view article (1.0)Environments of Fire Detectors. Phase 2. Effect of Ceiling Configuration. Volume 1. Measurements.Factory Mutual Research Corp., Norwood, MANBS GCR 78-128National Bureau of Standards, Gaithersburg, MD, NBS GCR 78-128
June 1978
172 p.Heskestad, G.; Delichatsios, M. A.
view article (1.0)Environments of Fire Detectors. Phase 1. Effect of Fire Size, Ceiling Height and Materials. Volume 2. Analysis.Factory Mutual Research Corp., Norwood, MA['NBS GCR 77-95', 'FMRC Serial 22427']National Bureau of Standards, Gaithersburg, MD, NBS GCR 77-95; FMRC Serial 22427
July 1977
129 p.Harpe, S. W.; Waterman, T. E.; Christian, W. J.
view article (1.0)Detector Sensitivity and Siting Requirements for Dwelling: Phase 2. Final Report.IIT Research Inst., Chicago, IL 60616NBS GCR 77-82National Bureau of Standards, Gaithersburg, MD, NBS GCR 77-82
February 1977
379 p.Bukowski, R. W.; Waterman, T. E.; Christian, W. J.
view article (1.0)Detector Sensitivity and Siting Requirement for Dwellings. Final Technical Report.Underwriters Labs., Inc., Northbrook, IL; IIT Research Inst., Chicago, ILNBS GCR 75-51National Bureau of Standards, Gaithersburg, MD, NBS GCR 75-51
1975
337 p.Bineau, H.
view article (1.0)Means of Fire Protection in Buildings. Sprinklers, CO2, Halons: Study of Similarities.Centre National de Prevention et de Protection, Paris, FranceCommission of the European Communities. Fires in Buildings. September 18-21, 1984, Elsevier Applied Science Publishers, NY, Luxembourg, Mourareau, R.; Thomas, M., Editors, 342-340 p., 1984Thompson, C.
view article (1.0)Fire Detectors for Offshore Applications--Types and New Developments Described.Bechtel Ltd., UKFire, Vol. 79, No. 978, 39-40, December 1986Drouin, J. A.; Cote, A. E.
view article (1.0)Smoke and Heat Detector Performance: Field Demonstration Test Results.Simplex Time Recorder Co., Gardner, MA; National Fire Protection Assoc., Quincy, MAFire Journal, Vol. 78, No. 1, 34-38,69, January 1984Evans, D. D.; Stroup, D. W.
view article (1.0)Methods to Calculate the Response Time of Heat and Smoke Detectors Installed Below Large Unobstructed Ceilings.National Bureau of Standards, Gaithersburg, MDNBSIR 85-3167Fire Technology, Vol. 22, No. 1, 54-65, February 1986Nuclear Regulatory Commission, Washington, DC, NBSIR 85-3167
July 1985
49 p.Bukowski, R. W.
view article (1.0)Tests on the Performance of Automatic Fire Detectors in Health Care Occupancies: A Preliminary Report.National Bureau of Standards, Gaithersburg, MDNBSIR 79-1739Department of Health Education and Welfare, Washington, DC, NBSIR 79-1739
April 1979
28 p.Schnell, M.
view article (1.0)Points of View in Testing Flame Detectors. Final Report.National Bureau of Standards, Gaithersburg, MDNBSIR 76-1040NBSIR 76-1040
May 1976
18 p.