displaying 551 - 560 results in total 1146
Portier, R. W.
view article (1.0)Fire Data Management System, FDMS 2.0.National Institute of Standards and Technology, Gaithersburg, MDNISTIR 5499NISTIR 5499
September 1994National Institute of Standards and Technology. Annual Conference on Fire Research: BOOK OF ABSTRACTS. October 17-20, 1994, Gaithersburg, MD, 39-40 p., 1994Bryner, N. P.; Johnsson, E. L.; Pitts, W. M.
view article (1.0)Carbon Monoxide Production in Compartment Fires: Full-Scale Enclosure Burns.National Institute of Standards and Technology, Gaithersburg, MDNISTIR 5499NISTIR 5499
September 1994National Institute of Standards and Technology. Annual Conference on Fire Research: BOOK OF ABSTRACTS. October 17-20, 1994, Gaithersburg, MD, 53-54 p., 1994Pepi, J. S.
view article (1.0)Fire Test Status Report on the Evaluation of the AquaMist Fixed Water Mist Deluge System in Ventilated Marine Machinery Spaces.Grinnell Corp., Providence, RISociety of Fire Protection Engineers and PLC Education Foundation. Technical Symposium on Halon Alternatives, Proceedings. June 27-28, 1994, Knoxville, TN, 85-102 p., 1994Vandevelde, P.; VanHees, P.
view article (1.0)Full Scale Fire Tests on PVC Floor Coverings in a Room Corridor Rig and Comparison With Small Scale Tests.University of Gent, Belgium
[date unknown]
11 p.Hirschler, M. M.
view article (1.0)Use of Large Scale Heat Release Testing to Predict Flame Spread of Electrical Cables.Safety Engineering Laboratories, Rocky River, OHInternational Association for Fire Safety Science. Fire Safety Science. Proceedings. 4th International Symposium. Poster Paper. July 13-17, 1994, Intl. Assoc. for Fire Safety Science, Boston, MA, Ottawa, Ontario, Canada, Kashiwagi, T., Editors, 1313 p., 1994Hirschler, M. M.
view article (1.0)Tools Available to Predict Full Scale Fire Performance of Furniture.Safety Engineering Laboratories, Rocky River, OHAmerican Chemical Society. Fire and Polymers. ACS Symposium Series XXX. Developed From ACS Symposium, 208th National Meeting. Chapter XX. August 21-25, 1994, Washington, DC, Nelson, G. L., Editors, 1994Hirschler, M. M.
view article (1.0)Smoke Corrosivity: Technical Issues and Testing.Safety Engineering Laboratories, Rocky River, OHAmerican Chemical Society. Fire and Polymers. ACS Symposium Series XXX. Developed From ACS Symposium, 208th National Meeting. Chapter XX. August 21-25, 1994, Washington, DC, Nelson, G. L., Editors, 1994Bill, R. G., Jr.; Hill, E. E., Jr.
view article (1.0)Sprinkler Protection of Manufactured Homes With Sloped Ceilings Using Prototype Limited Water Supply Sprinklers.Factory Mutual Research Corp., Norwood, MAFire Technology, Vol. 31, No. 1, 17-43, First Quarter 1995Fire Administration, Washington, DC,Heskestad, A. W.; Hovde, J.
view article (1.0)Smoke and CO Production in Bench Scale, Medium Scale and Large Scale Fires: Effect of Scale and Combustion Conditions.Trondheim Univ., NorwayCombustion Institute. Symposium (International) on Combustion, 25th. Proceedings. Abstracts of Work-in-Progress Poster Session Presentations. Work-in-Poster Session 4. Paper 16. July 31-August 5, 1994, Combustion Institute, Pittsburgh, PA, Irvine, CA, 302 p., 1994Cahill, P.
view article (1.0)Full-Scale Fire Testing of Seat Component Materials. Technical Note.Federal Aviation Administration, Atlantic City International Airport, NJDOT/FAA/CT-TN93/13DOT/FAA/CT-TN93/13
October 1993
23 p.