Larson, R. D.
view article (1.0)
Helicopter Crash Sparks 7-Alarm High-Rise Incident in San Jose. On the Job: California.
San Jose Fire Dept., CA
Firehouse,
Vol. 19,
No. 10,
34-37,86,
October 1994
Jones, J. C.
view article (1.0)
Further Calculations Regarding the Accidental Supply of Heat to a Bed of Forest Material.
New South Wales Univ., Kensington, Australia
Journal of Fire Sciences,
Vol. 12,
No. 6,
502-505,
November/December 1994
Lamkie, A. J.; Davis, D.
view article (1.0)
Night Into Day: The Edison, New Jersey, Gas Pipeline Explosion.
Edison Township Division of Fire, NJ
Fire Engineering,
Vol. 148,
No. 5,
34-42,
May 1995
Waterman, T. E.
view article (1.0)
Fire Laboratory Tests. Phase 3. Fires in Blast Initiated Debris External to Shelters. Final Report. January 1, 1972-December 31, 1972.
IIT Research Inst., Chicago, IL
Defense Civil Preparedness Agency, Washington, DC,
IITRI-J6217,
February 1973,
112 p.
O'Connell, J. P.
view article (1.0)
Collapse Search and Rescue Operations: Tactics and Procedures. Part 15. Air Bag Operations.
New York City Fire Dept., NY
Fire Engineering,
Vol. 148,
No. 7,
50-51,
July 1995
Sullivan, B.
view article (1.0)
Burns Illustrate Need for Bunker Gear.
Firehouse,
Vol. 19,
No. 7,
112,
July 1994
Melissi, S.; McDonough, D.
view article (1.0)
Lifting Debris By Crane. Heavy Construction Equipment Aids In Search for Victims.
New York City Fire Dept., Bronx, NY
Firehouse,
Vol. 20,
No. 9,
78,80,
September 1995
Forsyth, D.
view article (1.0)
Bombing Puts CISD To the Test.
Orange County Fire Authority, CA
Firehouse,
Vol. 20,
No. 9,
72-77,
September 1995
DeMaine, B. P.; Fesko, J. J.; Eppink, G. D.
view article (1.0)
Trace Accelerant Analysis of Debris Samples Using an Automated Purge and Trap Sample Introduction System Coupled With a Gas Chromatograph/Mass Spectrometer.
TolTest, Inc.
Fire and Arson Investigator,
Vol. 46,
No. 2,
12-14,
December 1995
Watt, J. M., Jr.; Vitaya-Udom, K. P.
view article (1.0)
Design of Structures to Structures to Resist Terrorist Attack. Report 2. Full-Scale Perimeter Wall and Window Test.
U.S. Army Engineer Waterways Experiment Station, Vicksburg, MI
U.S. Department of State, Washington, DC,
Technical Report SL-87-13; Report 2; Project 1038-603318,
October 1987,
148 p.