FireDOC Search

displaying 811 - 820 results in total 1650

  • Frazeur, D.
    view article (4.9108973)

    Measuring and Creating Value in the Fire Service.
    Los Angeles Fire Dept., CA
    Fire Engineering, Vol. 155, No. 8, 91-92, August 2002

  • Choppen, B.
    view article (4.9108973)

    Case for Voice Alarms.
    Fire Safety Engineering, Vol. 8, No. 6, 18-20, November 2001

  • Weber, R. D.
    view article (4.9108973)

    Performance Design Review and Verification Techniques.
    Clark County Building Department, Las Vegas, NV
    Performance-Based Codes and Fire Safety Design Methods, 3rd International Conference. Proceedings. June 15-17, 2000, Lund, Sweden, Jonsson, R.; Almand, K.; Maskas, J., Editors, 341-352 p., 2000

  • Staub-French, S.; Fischer, M.
    view article (4.9108973)

    Generating and Maintaining Activity-Based Cost Estimates With Feature-Based Product Models.
    University of British Columbia, Canada; Stanford Research Inst., Menlo Park, CA
    NIST SP 989, September 2002,
    International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 287-292 p., 2002

  • Hanser, A.
    view article (4.9108973)

    Assembly + Disassembly of Interior Wall.
    Technical University Munich
    NIST SP 989, September 2002,
    International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 299-302 p., 2002

  • Wang, W. C.
    view article (4.9108973)

    Simulation-Facilitated Factor-Based Approach for Cost Correlation Evaluation.
    National Chiao Tung Univ., Hsin-Chu, Taiwan
    NIST SP 989, September 2002,
    International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 97-102 p., 2002

  • Azhar, S.; Ahmed, S. M.; Caballero, A. A.
    view article (4.9108973)

    Development of an Integrated Cost Estimation and Cost Control System for Construction Projects.
    Florida International Univ., Miami
    NIST SP 989, September 2002,
    International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 129-134 p., 2002

  • Lucas, P. J.
    view article (4.9108973)

    What Do You Want Tunnel Fire Dampers To Do?
    American Warming and Ventilating
    Tunnel Fires and Escape From Tunnels, 3rd International Conference. Organised and Sponsored by Tunnel Management International. Proceedings. October 9-11, 2001, Washington, DC, 299-306 p., 2001

  • Karter, M.; Badger, S.
    view article (4.9108973)

    Fire Loss/Large Loss, 2001.
    NFPA Journal, Vol. 96, No. 6, 70-75, November/December 2002

  • Phillip, C.
    view article (4.9108973)

    Radio Activity.
    Fire Engineers Journal, Vol. 63, No. 228 / Fire Prevention, No. 364, 41-43, January 2003