displaying 831 - 840 results in total 950
Dills, R. L.; Beaudreau, M.; Hagood, C.
view article (1.0)Chemical Composition of Overhaul Smoke After Use of Three Extinguishing Agents.Washington Univ., Seattle; City of Renton Fire Dept., Renton, WAFire Technology, Vol. 44, No. 4, 419-437, December 2008Bertwistle, J.
view article (1.0)Out of Office.Fire Risk Management, 37-39, December 2008Su, J. Z.; Benichou, N.; Bwalya, A. C.; Lougheed, G. D.; Taber, B. C.; Leroux, P.; Proulx, G.; Kashef, A.; McCartney, C.; Thomas, J. R.
view article (1.0)Fire Performance of Houses. Phase I. Study of Unprotected Floor Assemblies in Basement Fire Scenarios. Summary Report.National Research Council of Canada, Ottawa, OntarioIRC-RR-252IRC-RR-252
December 2008
55 p.Kuligowski, E. D.
view article (1.0)Computer Evacuation Models for Buildings.National Institute of Standards and Technology, Gaithersburg, MDNFPA HFPE08NFPA HFPE08SFPE Handbook of Fire Protection Engineering. 4th Edition. Section 3. Chapter 8, DiNenno, P. J.; Drysdale, D.; Beyler, C. L.; Walton, W. D.; Custer, R. L. P.; Hall, J. R., Jr.; Watts, J. M., Jr., Editors, 3/456-478 p., 2008Tsai, W. L.
view article (1.0)Validation of EvacuatioNZ Model for High-Rise Building Analysis.University of Canterbury, Christchurch, New ZealandFire Engineering Research Report 07/8Fire Engineering Research Report 07/8
September 2007
247 p.Yu, K. X. J.
view article (1.0)Investigation of Recessed and Concealed Sprinklers Activation in Wind Tunnel Plunge Test and in BRANZFIRE Computer Model.University of Canterbury, Christchurch, New ZealandFire Engineering Research Report 07/9Fire Engineering Research Report 07/9
March 2007
282 p.Zolfaghari, M. R.; Peyghaleh, E.; Nasirzadeh, G.
view article (1.0)Fire Following Earthquake, Intra-Structure Ignition Modeling.Toosi University of Technology, Tehran, IranJournal of Fire Sciences, Vol. 27, No. 1, 45-79, January 2009Liu, Z. G.; Crampton, G. P.; Kashef, A.; Lougheed, G. D.; Gibbs, E.; Muradori, S.
view article (1.0)International Road Tunnel Fire Detection Research Project. Phase II Task 2: Full-Scale Fire Tests in a Laboratory Tunnel.National Research Council of Canada, Ottawa, Ontario['IRC-RR-270', 'Research Report IRC-RR-270']IRC-RR-270; Research Report IRC-RR-270
September 12, 2008
66 p.Saber, H. H.; Kashef, A.; Bwalya, A. C.
view article (1.0)Post-Flashover Compartment Fire for Different Fire Ventilation Settings in a Medium-Sized Residential Room.National Research Council of Canada, Ottawa, OntarioNRCC-50860NRCC-50860
2008
13 p.ASME International Mechanical Engineering Congress and Exposition. IMECE2008. Proceedings. November 2-6, 2008, Boston, MA, 2008Liu, Z. G.; Crampton, G. P.; Kashef, A.; Lougheed, G. D.; Gibbs, E.; Su, J. Z.; Benichou, N.
view article (1.0)International Road Tunnel Fire Detection Research Report. Phase II Task 1: Fire Detectors, Fire Scenarios and Test Protocols.National Research Council of Canada, Ottawa, Ontario['IRC-RR-269', 'Research Report IRC-RR-269']IRC-RR-269; Research Report IRC-RR-269
September 12, 2008
32 p.