displaying 1 - 7 results in total 7
Chapman, R. E.; Hall, W. G.; Chen, P. T.
view article (1.0)Computerized Approach for Identifying Cost-Effective Fire Safety Retrofits in Health Care Facilities. Final Report.National Bureau of Standards, Gaithersburg, MDNBSIR 79-1929, January 1980, 124 p.Chapman, R. E.; Chen, P. T.; Hall, W. G.
view article (1.0)Economic Aspects of Fire Safety in Health Care Facilities: Guidelines for Cost-Effective Retrofits. Final Report.National Bureau of Standards, Gaithersburg, MDDepartment of Health, Education and Welfare, Washington, DC, NBSIR 79-1902, November 1979, 117 p.Chen, P. T.
view article (1.0)Economic Analysis of the Norris Cotton Federal Office Building. Final Report.National Bureau of Standards, Washington, DCDepartment of Energy, Washington, DC, NBSIR 78-1568, November 1978,Chapman, R. E.; Crenshaw, R. W.; Barnes, K. A.; Chen, P. T.
view article (1.0)Optimizing Weatherization Investments in Low-Income Housing: Economic Guidelines and Forecasts. Final Report.National Bureau of Standards, Washington, DCCommunity Services Administration, Washington, DC, NBSIR 79-1948, February 1980,Lerchen, F. H.; Pielert, J. H.; Chen, P. T.
view article (1.0)Preliminary Guidelines for Condition Assessment of Buildings Being Considered for Solar Retrofit.National Bureau of Standards, Washington, DCDepartment of Energy, Washington, DC, NBSIR 81-2289, July 1981,Chen, P. T.; Chapman, R. E.
view article (1.0)Budget Estimates for Replacement of Plant and Facility Equipment at the NBS Campuses.National Bureau of Standards, Washington, DCNBSIR 80-1973(R), June 1980, 66 p.Chen, P. T.
view article (1.0)Preliminary Study of Planned Replacement of Plant and Facility Equipment at the NBS Gaithersburg Site.National Bureau of Standards, Washington, DCNBSIR 78-1567, November 1978, 25 p.