FireDOC Search

displaying 1 - 7 results in total 7

  • Chapman, R. E.; Hall, W. G.; Chen, P. T.
    view article (1.0)

    Computerized Approach for Identifying Cost-Effective Fire Safety Retrofits in Health Care Facilities. Final Report.
    National Bureau of Standards, Gaithersburg, MD
    NBSIR 79-1929, January 1980, 124 p.

  • Chapman, R. E.; Chen, P. T.; Hall, W. G.
    view article (1.0)

    Economic Aspects of Fire Safety in Health Care Facilities: Guidelines for Cost-Effective Retrofits. Final Report.
    National Bureau of Standards, Gaithersburg, MD
    Department of Health, Education and Welfare, Washington, DC, NBSIR 79-1902, November 1979, 117 p.

  • Chen, P. T.
    view article (1.0)

    Economic Analysis of the Norris Cotton Federal Office Building. Final Report.
    National Bureau of Standards, Washington, DC
    Department of Energy, Washington, DC, NBSIR 78-1568, November 1978,

  • Chapman, R. E.; Crenshaw, R. W.; Barnes, K. A.; Chen, P. T.
    view article (1.0)

    Optimizing Weatherization Investments in Low-Income Housing: Economic Guidelines and Forecasts. Final Report.
    National Bureau of Standards, Washington, DC
    Community Services Administration, Washington, DC, NBSIR 79-1948, February 1980,

  • Lerchen, F. H.; Pielert, J. H.; Chen, P. T.
    view article (1.0)

    Preliminary Guidelines for Condition Assessment of Buildings Being Considered for Solar Retrofit.
    National Bureau of Standards, Washington, DC
    Department of Energy, Washington, DC, NBSIR 81-2289, July 1981,

  • Chen, P. T.; Chapman, R. E.
    view article (1.0)

    Budget Estimates for Replacement of Plant and Facility Equipment at the NBS Campuses.
    National Bureau of Standards, Washington, DC
    NBSIR 80-1973(R), June 1980, 66 p.

  • Chen, P. T.
    view article (1.0)

    Preliminary Study of Planned Replacement of Plant and Facility Equipment at the NBS Gaithersburg Site.
    National Bureau of Standards, Washington, DC
    NBSIR 78-1567, November 1978, 25 p.