displaying 1 - 7 results in total 7
Chapman, R. E.; Hall, W. G.; Chen, P. T.
view article (1.0)Computerized Approach for Identifying Cost-Effective Fire Safety Retrofits in Health Care Facilities. Final Report.National Bureau of Standards, Gaithersburg, MDNBSIR 79-1929NBSIR 79-1929
January 1980
124 p.Chapman, R. E.; Chen, P. T.; Hall, W. G.
view article (1.0)Economic Aspects of Fire Safety in Health Care Facilities: Guidelines for Cost-Effective Retrofits. Final Report.National Bureau of Standards, Gaithersburg, MDNBSIR 79-1902Department of Health, Education and Welfare, Washington, DC, NBSIR 79-1902
November 1979
117 p.Chen, P. T.
view article (1.0)Economic Analysis of the Norris Cotton Federal Office Building. Final Report.National Bureau of Standards, Washington, DCNBSIR 78-1568Department of Energy, Washington, DC, NBSIR 78-1568
November 1978Chapman, R. E.; Crenshaw, R. W.; Barnes, K. A.; Chen, P. T.
view article (1.0)Optimizing Weatherization Investments in Low-Income Housing: Economic Guidelines and Forecasts. Final Report.National Bureau of Standards, Washington, DCNBSIR 79-1948Community Services Administration, Washington, DC, NBSIR 79-1948
February 1980Lerchen, F. H.; Pielert, J. H.; Chen, P. T.
view article (1.0)Preliminary Guidelines for Condition Assessment of Buildings Being Considered for Solar Retrofit.National Bureau of Standards, Washington, DCNBSIR 81-2289Department of Energy, Washington, DC, NBSIR 81-2289
July 1981Chen, P. T.; Chapman, R. E.
view article (1.0)Budget Estimates for Replacement of Plant and Facility Equipment at the NBS Campuses.National Bureau of Standards, Washington, DCNBSIR 80-1973(R)NBSIR 80-1973(R)
June 1980
66 p.Chen, P. T.
view article (1.0)Preliminary Study of Planned Replacement of Plant and Facility Equipment at the NBS Gaithersburg Site.National Bureau of Standards, Washington, DCNBSIR 78-1567NBSIR 78-1567
November 1978
25 p.