Coble, J. B.; Achenbach, P. R.
view article (9.588148)
Site Analysis and Field Instrumentation for an Apartment Application of a Total Energy Plant. Final Report.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBSIR 75-711,
May 19, 1975,
Quindry, T. L.
view article (9.588148)
Acoustical Evaluation of a Single Family Attached Wood-Frame Modular Housing System Constructed on an Operation Breakthrough Prototype Site. Final Report.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBSIR 73-191,
April 1973,
National Bureau of Standards
view article (9.081846)
Guide Criteria for the Design and Evaluation of: Operation Breakthrough. Housing Systems. A Preliminary Report. Volume 4. Single Family Detached. 4 Volumes. (Supersedes NBS 10 200 dated March 1, 1970).
National Bureau of Standards, Gaithersburg, MD
NBS 10 200,
September 1, 1970,
400 p.
Wyly, R. S.; Rorrer, D. E.
view article (9.081846)
Field Test of Hydraulic Performance of a Single-Stack Drainage System at the Operation BREAKTHROUGH Prototype Site in King County, Washington. Final Report. April 1972-May 1973.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBSIR 73-161,
May 1973,
Quindry, T. L.
view article (9.081846)
Acoustical Evaluation of a Single Family Detached Honeycomb Panel Housing System Constructed on an Operation Breakthrough Prototype Site. Final Report.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBSIR 73-192,
April 1973,
Margulis, S. T.
view article (9.081846)
Methodology for Evaluating Housing in Use: A Case Study Approach.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBSIR 81-2258,
June 1981,
Son, B. C.; Fang, J. B.
view article (8.893883)
Fire Spread on Exterior Walls Due to Flames Emerging from a Window in Close Proximity to a Reentrant Wall Corner. Final Report.
National Bureau of Standards, Gaithersburg, MD
Department of Housing and Urban Development, Washington, DC,
NBSIR 73-266,
April 1973,
33 p.
Benjamin, I. A.
view article (8.893883)
Criteria for Fire Safety in Operation Breakthrough.
National Bureau of Standards, Washington, DC
Building Standards,
Vol. 40,
No. 6,
33-36,
November/December 1971
Yokel, F. Y.; Reichard, T. W.
view article (8.893883)
Evaluation of the Column Connections Used in a Precast Concrete Modular Housing System. Technical Note.
National Bureau of Standards, Washington, DC
NBS TN 811,
March 1974,
Liu, S. T.
view article (8.893883)
Analysis of Construction Systems for the Thermal Classification of Residential Buildings. Final Report.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBSIR 75-678,
November 24, 1975,