displaying 1141 - 1150 results in total 1895
Mitropoulos, P.; Tatum, C. B.
view article (1.0)Finding Technology Payback PotentialUniversity of Texas, Austin['Research Report 46-12', 'Research Team Number 46']Research Report 46-12; Research Team Number 46
October 1996
43 p.Howell, G. A.; Ballard, H. G.
view article (1.0)Managing Uncertainty in the Piping Function.University of Texas, Austin['Research Report 47-13', 'Research Team Number 47']Research Report 47-13; Research Team Number 47
September 1996
111 p.Wright, R. N.
view article (1.0)Standards Media and Methods.National Institute of Standards and Technology, Gaithersburg, MDAutomation in Construction, Vol. 8, 473-479, 1999Applications of the Performance Concept in Building. CIB-ASTM-ISO-RILEM 3rd International Symposium. Volume 1. Proceedings. National Building Research Institute. December 9-12, 1996, National Building Research Inst., Haifa, Israel, Tel-Aviv, Israel, 1/113-125 p., ['1999', '1996']National Aeronautics and Space Administration
view article (1.0)Reliability Centered Maintenance Guide for Facilities and Collateral Equipment.National Aeronautics and Space Administration, Washington, DC
December 1996
199 p.Fairley, T. E.
view article (1.0)Current Research Activities of the European Commission in the Field of Fire Safety.European Commission, Brussels, BelgiumFire Safety Developments From Around the World International Conference. Proceedings. Fire Retardant Chemicals Association. March 19-22, 1995, Fire Retardant Chemicals Assoc., Lancaster, PA, Lake Buena Vista, FL, 9-14 p., 1995Riddleston, H. G.
view article (1.0)Electrical Equipment for Hazardous Atmospheres.Electrical Review, Vol. 185, No. 6, 205-206, August 1969Tucker, R. L.; Kelly, W. R.; Thomas, S. R.
view article (1.0)Assessment Tool for Improving Project Team Communications.University of Texas, AustinResearch Report 105-11Research Report 105-11
January 1997
226 p.Griffith, A. F.; Gibson, G. E., Jr.
view article (1.0)Team Alignment During Pre-Project Planning of Capital Facilities.University of Texas, AustinResearch Report 113-12Research Report 113-12
January 1997
352 p.U.S. Department of Agriculture
view article (1.0)Specification for Hose, Cotton-Synthetic Jacketed, Lined 1 and 1-1/2 Inch.Department of Agriculture, Washington, DCInterim Specification 5100-186Interim Specification 5100-186
June 1972
14 p.Construction Industry Institute
view article (1.0)2% Engineering: Can It Work For You?Construction Industry Institute, Austin, TXResearch Summary 112-1Research Summary 112-1
March 1997
24 p.