displaying 1291 - 1300 results in total 1452
Williams, B.
view article (1.0)Light Maintenance.Fire Engineers Journal, Vol. 66, No. 271 / Fire Prevention, No. 407, 50-51, August 2006Treiber, B.
view article (1.0)Water Supply Analysis or "When a Curve Is Not a 'Curve'".Sprinkler Quarterly, No. 138, 43-44, September/October 2006Nassif, A.
view article (1.0)Postfire Full Stress-Strain Response of Fire-Damaged Concrete.Portsmouth Univ., Hampshire PO1 3HF, UKFire and Materials, Vol. 30, No. 5, 323-332, September/October 2006Flatley, C.; Knapp, J.; Pillsworth, T.
view article (1.0)Testing Your Target Flow.Fire Engineering, Vol. 159, No. 11, 87-88,90,92, October 2006George, D. R.
view article (1.0)What to Know About Smoke Detectors When Renovating Building Space.Corporate Communications, St.Charles, ILConsulting-Specifying Engineer, Vol. 40, No. 4, 19-20,22-23, October 2006Goodson, M. E.; Perryman, T.; Hergenrether, M.
view article (1.0)AC Adapter Fire Causation.Goodson EngineeringFire and Arson Investigator, Vol. 57, No. 2, 43-47, October 2006Compton, P.
view article (1.0)Reducing the Space Needed for a Smoke Shaft.Fire Safety Engineering, Vol. 13, No. 8, 27-27, October 2006Zhu, F. L.; Zhang, W. Y.
view article (1.0)Evaluation of Thermal Performance of Flame-Resistant Fabrics Considering Thermal Wave Influence in Human Skin Model.Donghua University Shanghai 200051, PR ChinaJournal of Fire Sciences, Vol. 24, No. 6, 465-485, November 2006Hock, L. P.
view article (1.0)Fire Resistance of Connections in Laminated Veneer Lumber (LVL).University of Canterbury, Christchurch, New ZealandFire Engineering Research Report 06/3, May 2006, 122 p.Ludwig, G.
view article (1.0)Why Are We Leaving EMS Out of the Fire Officer Testing Process?Firehouse, Vol. 31, No. 11, 40-40, November 2006