displaying 11 - 20 results in total 51
Avco Corporation
view article (1.0)Evaluation of the Thermal Properties of Materials. Volume 2. Data Handbook. Final Report. June 29-1965-June 28, 1966.Avco Corp., Lowell, MAAVSSD 0197-66-RRNational Aeronautics and Space Admin., Houston, TX, AVSSD 0197-66-RR
June 28, 1966
23 p.Quigg, P. S.; Orals, D. L.
view article (1.0)Communication Cable "Poke Thru" Floor Fire Test.Gypsum Co., Evanston, ILBuilding Standards, Vol. 46, No. 2, 44-51, March/April 1977Nicolson, P. C.; Artman, D. D.
view article (1.0)Technique for the Evaluation of AFFF Sealing Characteristics.CIBA-GEIGY Corp.Fire Technology, Vol. 13, No. 1, 13-20, February 1977Woolhead, F.
view article (1.0)Threat to a Business Due to Fire at Electric Cable Terminatios.Fire Risk Management Services, EnglandFire Surveyor, Vol. 19, No. 2, 17-19, April 1990Schmidt, H. W.; Forney, D. E.
view article (1.0)ASRDI Oxygen Technology Survey. Volume 9. Oxygen Systems Engineering Review.National Bureau of Standards, Gaithersburg, MDNASA SP-3093National Aeronautics and Space Admin., Washington, DC, NASA SP-3093
1975
225 p.Hanson, L. C.; Hodges, J. E.; Redmond, K. M.
view article (1.0)Determining Effectiveness of Past Mine Fire Surface Seal Abatement Methods. Final Report.L. C. Hanson Co., Helena, MTFinal ReportDepartment of Interior, Denver, CO, Final Report
December 1990
230 p.French, J. L.
view article (1.0)Stack Venting of Plumbing Fixtures.National Bureau of Standards, Washington, DCBMS 118BMS 118
January 23, 1950
23 p.French, J. L.; Eaton, H. N.; Wyly, R. S.
view article (1.0)Wet Venting of Plumbing Fixtures.National Bureau of Standards, Washington, DCBMS 119BMS 119
December 1, 1950
29 p.French, J. L.; Eaton, H. N.
view article (1.0)Self-Siphonage of Fixture Traps.National Bureau of Standards, Washington, DCBMS 126BMS 126
October 15, 1951
35 p.Davis, K.; Eapen, K. C.; Cerbus, C.; Chen, G.; Chen, L.; Dyhouse, V.; Fultz, G.; John, P.; Liang, J.; Mortimer, R.; Schreiber, B.; Scott, O.; Wical, T.
view article (1.0)Fluids, Lubricants, Coatings, and Elastomer Materials. Final Report. September 1, 1989-February 28, 1991.University of Dayton Research Inst., OH['UDR-TR-91-103', 'WL-TR-91-4097']Wright Lab., Wright-Patterson AFB, OH, UDR-TR-91-103; WL-TR-91-4097
July 1991
387 p.