FireDOC Search

displaying 61 - 70 results in total 204

  • Cummings, M.
    view article (7.135936)

    Fire Doors: The Testing and Certification Process. (Behind Closed Doors.)
    Fire Safety Engineering, Vol. 15, No. 3, 23-24, April 2008

  • Cummings, M.
    view article (7.135936)

    Test Resources.
    Chiltern International Fire
    Fire Risk Management, 59-61, February 2009

  • Sullivan, C. C.; Horwitz-Bennett, B.
    view article (7.135936)

    High-Velocity Hurricane Zones.
    Building Design and Construction, Vol. 50, No. 9, 37-40, September 2009

  • Penrod, B.
    view article (7.135936)

    Use of Fire-Rated Glass in High Rise Construction.
    Pilkington Fire Protection Glass
    Life Safety Digest, Vol. 6, No. 1, 10-11,13, Winter 2010

  • Goodburn, S.
    view article (7.135936)

    Fire Safety Education.
    International Fire Protection (IFP) Magazine, No. 41, 25-26,28, February 2010

  • Porter, A. M.; Barnfield, J. R.
    view article (7.075843)

    Use of Drenchers to Provide Fire Protection to Glazing.
    Fire Surveyor, Vol. 16, No. 1, 4-12, February 1987

  • Reid, P.
    view article (7.075843)

    Wired Glazing Over Market Caused Rapid Build-Up of Smoke and Heat.
    Fire, Vol. 75, No. 926, 117, August 1982

  • Astbury, N. F.; West, H. W. H.; Hodgkinson, H. R.
    view article (7.075843)

    Experimental Gas Explosions: Report of Further Tests at Potters Marston.
    British Ceramic Research Assoc., England
    Special Publication 74, 1972, 28 p.

  • Klein, W.
    view article (7.075843)

    Fire Resisting Glass Can Help Check Flame Spread.
    Schott Glaswerke, Mainz, West Germany
    Fire International, Vol. 122, 33-35, April/May 1990

  • Fisher, R. W.; Smart, P. M. T.
    view article (7.075843)

    Results of Fire Resistance Tests on Elements of Building Construction.
    Fire Protection Assoc., London, England; Fire Research Station, Borehamwood, England
    BRE Report R6, 1975, 132 p.