displaying 1 - 10 results in total 17
Walton, W. D.; Waksman, D.
view article (1.0)Fire Testing of Roof-Mounted Solar Collectors by ASTM E 108.National Bureau of Standards, Gaithersburg, MDNBSIR 81-2344Department of Energy, Washington, DC, NBSIR 81-2344
August 1981
74 p.Waksman, D.; Walton, W. D.
view article (1.0)Fire Testing of Solar Collectors by ASTM E 108.National Bureau of Standards, Gaithersburg, MDCIB W14/82/62 (USA)Fire Technology, Vol. 18, No. 2, 174-187, May 1982CIB W14/82/62 (USA)Waksman, D.; Ferguson, J. B.; Godette, M.; Reichard, T.
view article (1.0)Potential Systems for Lead Hazard Elimination: Evaluations and Recommendations for Use. Final Report.National Bureau of Standards, Gaithersburg, MD['NBS TN 808', 'NBS Technical Note 808']Department of Housing and Urban Development, Washington, DC, NBS TN 808; NBS Technical Note 808
December 1973
192 p.Waksman, D.; Streed, E.; Seiler, J.
view article (1.0)NBS Solar Collector Durability/Reliability Test Program Plan. Final Report.National Bureau of Standards, Gaithersburg, MDNBS TN 1136Department of Energy, Washington, DC, NBS TN 1136
January 1981
85 p.Waksman, D.; Ferguson, J. B.
view article (1.0)Fire Tests of Building Interior Covering Systems.National Bureau of Standards, Washington, DCFire Technology, Vol. 10, No. 3, 211-220, August 1974Waksman, D.; Skoda, L. F.; Clark, E. J.
view article (1.0)Hazard Elimination Procedures for Leaded Paints in Housing. Final Report.National Bureau of Standards, Washington, DCNBS TN 770Department of Housing and Urban Development, Washington, DC, NBS TN 770
May 1973Waksman, D.; Thomas, W. C.; Streed, E. R.
view article (1.0)NBS (National Bureau of Standards) Solar Collector Durability/Reliability Test Program: Final Report.National Bureau of Standards, Gaithersburg, MD; Virginia Polytechnic Institute and State Univ., BlacksburgNBS TN 1196Department of Energy, Washington, DC, NBS TN 1196
September 1984Waksman, D.; Skoda, L. F.; Clark, E. J.; Godette, M.
view article (1.0)Evaluation of Lead Paint Hazard Elimination Methods. Part 2. Milestone Report (7b). Interim Report.National Bureau of Standards, Washington, DCNBSIR 73-127Department of Housing and Urban Development, Washington, DC, NBSIR 73-127
March 1973Waksman, D.; Pielert, J. H.; Dikkers, R. D.; Streed, E. R.
view article (1.0)Plan for the Development and Implementation of Standards for Solar Heating and Cooling Applications. Interim Report.National Bureau of Standards, Washington, DCNBSIR 76-1143Energy Research and Development Administration, Washington,DC, NBSIR 76-1143
August 1976Streed, E.; McCabe, M.; Waksman, D.; Hebrank, J.; Richtmyer, T.
view article (1.0)Thermal Data Requirements and Performance Evaluation Procedures for the National Solar Heating and Cooling Demonstration Program. Interim Report.National Bureau of Standards, Washington, DCNBSIR 76-1137Energy Research and Development Administration, Washington, DC; Department of Housing and Urban Development, Washington, DC, NBSIR 76-1137
August 1976