FireDOC Search

displaying 1 - 10 results in total 17

  • Walton, W. D.; Waksman, D.
    view article (1.0)

    Fire Testing of Roof-Mounted Solar Collectors by ASTM E 108.
    National Bureau of Standards, Gaithersburg, MD
    Department of Energy, Washington, DC, NBSIR 81-2344, August 1981, 74 p.

  • Waksman, D.; Walton, W. D.
    view article (1.0)

    Fire Testing of Solar Collectors by ASTM E 108.
    National Bureau of Standards, Gaithersburg, MD
    Fire Technology, Vol. 18, No. 2, 174-187, May 1982
    CIB W14/82/62 (USA),

  • Waksman, D.; Ferguson, J. B.; Godette, M.; Reichard, T.
    view article (1.0)

    Potential Systems for Lead Hazard Elimination: Evaluations and Recommendations for Use. Final Report.
    National Bureau of Standards, Gaithersburg, MD
    Department of Housing and Urban Development, Washington, DC, NBS TN 808; NBS Technical Note 808, December 1973, 192 p.

  • Waksman, D.; Streed, E.; Seiler, J.
    view article (1.0)

    NBS Solar Collector Durability/Reliability Test Program Plan. Final Report.
    National Bureau of Standards, Gaithersburg, MD
    Department of Energy, Washington, DC, NBS TN 1136, January 1981, 85 p.

  • Waksman, D.; Ferguson, J. B.
    view article (1.0)

    Fire Tests of Building Interior Covering Systems.
    National Bureau of Standards, Washington, DC
    Fire Technology, Vol. 10, No. 3, 211-220, August 1974

  • Waksman, D.; Skoda, L. F.; Clark, E. J.
    view article (1.0)

    Hazard Elimination Procedures for Leaded Paints in Housing. Final Report.
    National Bureau of Standards, Washington, DC
    Department of Housing and Urban Development, Washington, DC, NBS TN 770, May 1973,

  • Waksman, D.; Thomas, W. C.; Streed, E. R.
    view article (1.0)

    NBS (National Bureau of Standards) Solar Collector Durability/Reliability Test Program: Final Report.
    National Bureau of Standards, Gaithersburg, MD; Virginia Polytechnic Institute and State Univ., Blacksburg
    Department of Energy, Washington, DC, NBS TN 1196, September 1984,

  • Waksman, D.; Skoda, L. F.; Clark, E. J.; Godette, M.
    view article (1.0)

    Evaluation of Lead Paint Hazard Elimination Methods. Part 2. Milestone Report (7b). Interim Report.
    National Bureau of Standards, Washington, DC
    Department of Housing and Urban Development, Washington, DC, NBSIR 73-127, March 1973,

  • Waksman, D.; Pielert, J. H.; Dikkers, R. D.; Streed, E. R.
    view article (1.0)

    Plan for the Development and Implementation of Standards for Solar Heating and Cooling Applications. Interim Report.
    National Bureau of Standards, Washington, DC
    Energy Research and Development Administration, Washington,DC, NBSIR 76-1143, August 1976,

  • Streed, E.; McCabe, M.; Waksman, D.; Hebrank, J.; Richtmyer, T.
    view article (1.0)

    Thermal Data Requirements and Performance Evaluation Procedures for the National Solar Heating and Cooling Demonstration Program. Interim Report.
    National Bureau of Standards, Washington, DC
    Energy Research and Development Administration, Washington, DC; Department of Housing and Urban Development, Washington, DC, NBSIR 76-1137, August 1976,