FireDOC Search

displaying 1 - 7 results in total 7

  • Gibbs and Cox, Inc.
    view article (1.0)

    Literature Search and Accumulation of Basic Data for Preparation of Damage Control Criteria. Phase 1.
    Gibbs and Cox, Inc., New York
    ['Phase 1', 'G&C Project 16381']
    Naval Ship Engineering Center, Washington, DC, Phase 1; G&C Project 16381
    January 1969
    370 p.

  • Walker, D.; Joback, K.
    view article (1.0)

    Oil Additives for Drop-In Replacement Refrigerants. Phase 1. Final Report. April 8, 1994-October 8, 1994.
    Foster-Miller, Inc., Waltham, MA; Molecular Knowledge Systems, Inc., Nashua, NH
    ['Phase 1', 'Final Report', 'PL-TR-95-1026']
    Phillips Laboratory, Kirtland AFB, NM, Phase 1; Final Report; PL-TR-95-1026
    April 1995
    60 p.

  • National Fire Protection Association
    view article (1.0)

    FIFI: Fire Information Field Investigation. Phase 1. Final Report.
    National Fire Protection Association, Boston, MA
    ['Phase 1', 'Final Report']
    National Bureau of Standards, Washington, DC, Phase 1; Final Report
    July 1972
    281 p.

  • Kerlin, D. J.; McDaniel, D. E.
    view article (1.0)

    Machinery Space Fire Detecting Tests. Phase 1.
    Coast Guard Headquarters, Washington, DC
    Phase 1
    Phase 1
    August 1970
    36 p.

  • Holsten, J. R.; Lilyquist, M. M.
    view article (1.0)

    Development of a flameproof Organic Fabric. Phase 1.
    Monsanto Co., St. Louis, MO
    Phase 1
    National Aeronautics and Space Administration, Houston, TX, Phase 1
    August 1969
    36 p.

  • W.S. Atkins and Partners
    view article (1.0)

    Fire Protection of Structural Hollow Sections by Filling With Water. Phase 1.
    W.S. Atkins and Partners, Surray, England
    Phase 1
    Phase 1
    January 1967
    35 p.

  • James F. Hickling Management Consultants Ltd.
    view article (1.0)

    Development of a Conceptual Model of Fire Propagation on Board Ship - SMOF. Phase 1. Final Report.
    James F. Hickling Management Consultants, Ltd., UK
    ['Phase 1', 'Final Report']
    Phase 1; Final Report
    March 1984
    169 p.